Current priority projects
Toilet Block Renovation
The existing toilet block is nearly 20 years old and urgently needs rebuilding.
A clean and hygienic facility is essential for health, especially for girl students.
Scope of work
-
New plumbing and drainage
-
Electrical rewiring
-
Tiling and flooring
-
Masonry and painting
-
Better ventilation and safety features
Goal: ₹4.8 lakhs
Your support helps us ensure a dignified, safe space for every child.
Science Lab Phase 1
This project will introduce structured lab sessions for classes 5–10.
Scope of work
-
Setting up a dedicated lab space
-
Workbenches and storage
-
Basic apparatus for physics, chemistry, and biology
-
Safety equipment
-
Hiring a trained science teacher and one assistant
Goal: ₹5.3 lakhs
This lab will open a new world of discovery for our students.
Computer Lab Development
A computer lab helps rural children access technology, learn basic software skills, and build future readiness.
Scope of work
-
30 computers
-
Lab furniture and wiring
-
Software setup and maintenance
-
A full-time computer teacher and assistant
Goal: ₹12.5 lakhs
Your support helps bridge the digital divide for our children.
Library Upgrade
A well-designed library inspires reading, quiet reflection, and independent thinking.
Scope of work
-
Ventilated, dust-free reading space
-
Age-appropriate books in Kannada and English
-
Furniture, lighting, and storage
-
A full-time librarian
Goal: ₹12.5 lakhs
A strong library builds a strong foundation for lifelong learning.
Teacher Salary Support
Most students come from families who can pay only a small portion of fees, so we depend on supporters to ensure teacher salaries remain stable.
Scope of support
-
Monthly salaries for up to 7 teachers
-
PF and ESI contributions
-
Training and workshops
Goal: ₹2.5 lakhs per month
Supporting teachers means supporting every student in the classroom.
Roof Renovation & Weather Protection
Parts of the school still have old Mangalore-tile roofing, which is vulnerable to leaks, strong winds, and monkeys.
Scope of work
-
Removal of old tiles
-
Installation of a modern, weather-resistant roof
-
Provision for future solar panels and rainwater harvesting
Goal: ₹12.6 lakhs
A strong roof protects children and ensures uninterrupted learning.

Main Entrance & Pathway Enhancement
The school entrance needs improvement to ensure safety, accessibility, and visibility.
Scope of work
-
Secure main gate
-
Interlock-tiled pathway
-
New school name board with proper lighting
-
Landscaping and safety markers
Goal: ₹5.2 lakhs
A welcoming entrance reflects the dignity of the school and its community.

Playground Revitalization
Our playground needs improvements to support sports, free play, and cultural events.
Scope of work
-
Levelling and landscaping
-
Sports equipment and storage
-
Marked spaces for different games
-
Safe zones for younger children
Goal: ₹8.5 lakhs
A lively playground builds confidence, teamwork, and joy.

Mid-Day Meal Support (2025–28)
We plan to revive and strengthen it over the next three years.
Scope of support
-
Groceries and vegetables
-
Cooking costs
-
Kitchen maintenance
-
Hygiene and safety standards
Goal: As per annual projections
Nutritious meals improve health, attendance, and attention in class.






